Figure 11.

Execution time (sec) of 4 methods for: (a) number of SNPs = 1,000; (b) number of subjects = 2,000. Due to limited space in (b), we list hereby the execution time of the methods on 2000-subject 10,000-SNP data: SH - 962 seconds, IG - 18291 seconds, BEAM - 36423 seconds, FIM - 91251 seconds.

Chen et al. BMC Genomics 2011 12:344   doi:10.1186/1471-2164-12-344
Download authors' original image