Background

Studies of work time are one of the basic analyses for optimising production processes. The objectives of such investigations include optimisation of planning processes, stimulation of remuneration systems, optimisation of employment and implementation of standards for machine utilisation (Kanawaty 1992). In forestry, one of the goals of work time studies is to improve the efficiency of timber-harvesting operations (Stampfer and Lexer 2003; Kangas et al. 2002; Szewczyk 2009; Skoupý 2011). A key advancement in the field of work time research was the division of a work process into its basic elements, such as operations, treatments, activities and movements. This approach was proposed by F.W. Taylor at the beginning of the twentieth century and has been commonly employed in work-related investigations ever since (Sajkiewicz 1981; Palmroth 2011). Thus, the analysis of work time is based on distinguishing particular work cycles, i.e. recurrent work phases, and then measuring them using the chronometric method (time study) (Samset 1990; Kanawaty 1992). A time study is the most common manner of measuring work time at worksites in forestry. Accurate measurements of work times are particularly important in complex, variable production processes, which are typical of timber harvesting and extraction (Palmroth 2011; Szewczyk 2011a; Szewczyk and Stańczykiewicz 2012; Szewczyk et al. 2014).

Conducting a time study of modern timber-harvesting processes with the use of harvesters is difficult due to the fact that harvester work cycles are both short and very changeable. In work study research, time studies are conducted using microcomputers, on-board computer systems and digital video footage. For more than a decade, microcomputers equipped with time study software have been employed in these analyses (Sowa and Szewczyk 2013; Szewczyk 2014b; Eliasson et al. 2015). Time logs generated by the computer systems used to operate machinery may also be used to determine time used in their operation (Purfürst and Erler 2011). The most precise, but also the most time-consuming, method of time study is to collect digital video footage and then analyse this to determine specific work times (Walczyk et al. 2009; Smidt and McDaniel 2012; Borz et al. 2015). Microcomputer-generated measurements are much more accurate than comparable measurements taken using stopwatches, but accuracy is still limited due to a certain delay in the human response to observed phenomena and difficulty in distinguishing terminal points between particular activities. Defining the types and magnitude of such errors would make work time standards based on such simple calculation methods more objective. This would also facilitate a comparison of results across studies that have used different measurement methods.

The present research aims to compare the work cycle times for harvester operations measured using on-board microcomputers with those obtained from detailed video analysis. The analyses cover the duration of work cycles for a harvester performing thinning and clear-cutting operations in two Scots pine (Pinus sylvestris L.) stands located in south-western Poland.

Methods

Site details

The field research was carried out in Gidle Forest District, managed by the Regional Directorate of the State Forests in Katowice in south-western Poland. Two stands were selected for this study. Both were dominated by Scots pine and ranged in age from 86 up to 121 years. The species composition and the quality of timber harvested in those stands were consistent with the habitat type (Table 1).

Table 1 Selected features of the investigated stands

In the stands chosen for these studies, typical silvicultural treatments were performed, such as late (low) thinning and clear-cutting. In thinned stands, sanitation cuts were done, trees of low value were removed and preparatory cuts were executed for the purpose of preparation of the forest site for natural regeneration. As a result of these treatments, an increase in tree diameter growth was obtained by ensuring better crown light exposure for the most valuable trees, consequently improving the quality of harvested wood. The trees designated for felling were identified by employees of the State Forests, according to the Rules of Silviculture currently valid in Poland. These trees were marked with a dot of fluorescent paint at a height of ca. 170 cm. The dots were painted on the side of a tree stem facing the skid trails along which the harvester moved. With regard to clear-cut stands, tasks included all of the trees growing there, preceded by the removal of undergrowth in order to ensure appropriate visibility of tree stems. The boundaries of felling sites were permanently marked in the field with the use of horizontal lines painted on stems of the first trees that were excluded from harvesting.

The stands and the manner of harvesting performance corresponded with the standards accepted in the European forest management; thus, the results obtained in these studies are believed to have revealed average work conditions in Scots pine stands within the middle and older age classes.

The timber was harvested in both stands by means of the Ponsse ERGO harvester using the cut-to-length (CTL) system, where the entire wood-processing operation is performed directly after the tree has been felled (Dvořák et al. 2011). The felled trees were processed into the following assortment of sections: long wood with a length ranging from 8 to 12 m; logs with a length of 4 m; and middle-sized timber with a length of 2.5 m. The harvester operator had completed specialised training courses in operating multi-purpose machines and had 3 years’ experience.

Four working shifts were analysed, two for each cutting category (i.e. thinning or clear-cutting). The measurements were taken continuously over a period of over 500 min.

Work times were measured manually, with the use of the microcomputer PSION Workabout device (PSION TEKLOGIX Inc., Mississauga, Ontario, Canada) equipped with timing software especially designed for chronometry (PSION cumulative timing) (Suchomel et al. 2006; Sowa et al. 2007; Sowa and Szewczyk 2013). Simultaneously, the DOD LS 430W video camera (DODTech, ON, Canada) mounted in the operator’s cabin recorded the same work cycles. The duration of different activities in the work cycle was recorded to the nearest second (PSION method) or 0.1 s. (VIDEO method) and then classified according to the International Union of Forest Research Organisations (IUFRO) standards regarding forest work study nomenclature (Björheden 1991; IUFRO 1995; Szewczyk et al. 2014) (Table 2).

Table 2 Activities comprising the standard work cycle for a harvester operation

Data analysis

The recorded video footage was analysed using specialised computer software, Timer Pro Professional (Applied Computer Services, Inc., CO, USA), specially designed for chronometry (cumulative timing VIDEO). This software enables the investigator to stop the video footage at any point, rewind the recording frame by frame as many times as needed and select with great precision the exact moment when a particular operation occurred. The video footage was analysed by the same person who carried out the field research. This person had several months’ experience in conducting time studies using PSION microcomputers and had also completed specialised training in operating the Timer Pro Professional software.

The average duration of work cycles was also determined from the data collected in the PSION microcomputer using the standard calculation method of snap-back timing. The snap-back timing method consisted of measuring the durations of certain operations separately (i.e. the timer is snapped back, or reset, at the end of each activity), determining their mean value and totalling the data obtained according to the arbitrary, theoretical structure of work time cycles (the total of work times 1–5 in Table 2). Every main work cycle consisted of four activities: (1) positioning; (2) cutting time; (3) felling/pulling a tree onto a machine; and (4) delimbing and bucking (Nurminen et al. 2006) plus travel within a worksite (5). The start of the next cycle was indicated by another cutting operation.

The results obtained from the snap-back timing methods were compared with the cumulative timing PSION and cumulative timing VIDEO measurement methods. The mean duration of a work cycle was calculated based on the observed sequence of activities that occurred during the course of testing the measuring methods (cumulative timing PSION, cumulative timing VIDEO). The analyses were supplemented with the standard calculation method of snap-back timing. For this purpose, the database obtained in the VIDEO method was employed.

In the present research, it was assumed that the accuracy of the time study depended on: (1) the way in which work times were measured; and (2) the succession of work cycles. Due to the skewed distribution of the response variable, differences in the duration of work cycles and particular time categories, determined by the PSION (cumulative timing—CT PSION; snap-back timing—SB PSION) and the VIDEO (cumulative timing—CT VIDEO) methods, were compared using the non-parametric Mann-Whitney U test. The duration of work cycles recorded by means of the applied calculation methods, CT PSION and CT VIDEO, was determined using the single-band Fourier analysis for time series, obtained upon encoding individual activities according to the scheme presented in Table 2. A sequence of activities was considered a time series. Names of the following operations, encoded as numbers, were the observed variables, while the succession of particular activities (work sequence) formed the ordering variable. In contrast to random sampling, time series are characterised by a non-incidental order of observations. For such data, a cyclicality of its occurrence can be determined, which was used in the study presented here. Having obtained a time series with the use of a moving average (equal weights), the single-band Fourier analysis was employed to detect a variable cyclical structure of the time series under investigation (Szewczyk et al. 2014). With regard to the snap-back timing PSION calculation method, the duration of a work cycle was determined for regular, five-activity cycles.

Results

Data were collected for 579 work cycles comprising a total number of 2327 events. The homogeneity of the research sample was examined using variance analysis of the time taken to travel between successive worksites (travel between successive work cycles as described in Table 2). With regard to tasks performed by the harvester, the above-mentioned activity is characterised by the greatest variability within the group of all operational work times (Szewczyk and Kulak 2013). This particular activity was selected for the analysis due to its high level of variability. No statistically significant difference was found in the mean travel time within a worksite; therefore, subsequent analyses were performed using the entire research sample.

Duration of a work cycle

In the thinning operation, the mean duration of a harvester work cycle, determined using the cumulative timing PSION method, was 48 s (Table 3), which was significantly shorter than the work cycle recorded using the cumulative timing VIDEO method (Z = 4.23; p < 0.01). A statistically significant difference in work cycle duration between the measurement methods was also observed for the clear-cutting operation (Z = 2.09; p = 0.04). In this case, the cycle time calculated using the cumulative VIDEO method was 11.2 s longer than that estimated by the cumulative PSION method. The variability in cycle duration was also greater than estimated by the cumulative VIDEO method. In contrast to both of the cumulative timing methods, longer work cycles were calculated for the clear-cutting operation using the snap-backing timing method (Fig. 1).

Table 3 Mean and median (in parentheses) duration of activities constituting a work cycle measured by either the VIDEO or the PSION method
Fig. 1
figure 1

Descriptive statistics of the duration of a harvester work cycle determined by means of the cumulative timing PSION and the cumulative timing VIDEO methods—thinned and mature stands

Underestimation of the duration of a harvester work cycle, measured by the cumulative timing PSION method in thinned stands, was due to underestimation of the duration of nearly all of the activity categories (Table 3). The greatest differences were recorded for the delimbing and bucking time (24%). In the clear-cutting operation, the duration of delimbing and bucking activities was 5.3 s as determined by the cumulative timing PSION method in comparison with 26.2 s as determined by the cumulative VIDEO method. Large differences between timing methods were also observed for the duration of felling/pulling a tree onto a machine (cf. 4.1 and 19.3 s for CT VIDEO and CT PSION, respectively). Statistically significant differences were recorded for the travel time within a worksite, although the absolute difference was relatively small (2.6 s).

The number of activities within a work cycle

A measure of changeability of work at the investigated trial plots was the variability in succession of the observed activities. The succession of activities was displayed by series of following work times, encoded as numbers (Tab. 2). This allowed the creation of two time series (one for thinning operations and one for clear-cutting), whose observed variable was the sequence of activities (Figs. 2 and 3). A graphical analysis of the sequence of activities indicated that there were differences between thinning and clear-cutting operations. A significantly greater recurrence of work rhythm (visible as a sequence of the following numbers, operations) was recorded in thinning operations.

Fig. 2
figure 2

Fragment of a time series of operations performed by a harvester in thinned stands

Fig. 3
figure 3

Fragment of a time series of operations performed by a harvester in mature stands

Trends observed in these studies were described with the use of periodograms of time series, the highest peaks of which indicated the length of a recurrent cycle of observations. The observed successive operations formed cycles, which were regarded as regular fluctuations of time series. In Figs. 4 and 5, the analysis of cyclicality of the examined time series was graphically presented: fragments of periodograms precisely indicated periods of work cycles (StatSoft Inc. 2009). In these figures, the values of spectral densities, noted in thinning and clear-cut stands, show the frequency content in the stochastic process and allow for the identification of periodicity therein.

Fig. 4
figure 4

Fragment of a periodogram of a harvester operating in thinned stands

Fig. 5
figure 5

Fragment of a periodogram of a harvester operating in mature stands

Harvester operations in thinned stands were performed in stable, five-activity cycles, which was marked by the highest peak in the periodogram in Fig. 4. With regard to clear-cut stands, overlapping cycles of various lengths were recorded, while the total variability was described by two sequences: a considerably shorter one with five activities and a longer one containing several dozen activities (Fig. 5).

In the thinning operations, the trees designated for felling were evenly distributed throughout the entire stand, and the number of assortments produced was smaller than obtained from clear-cut stands. Consequently, in thinned stands, the harvester operated within stable work cycles in terms of the number of activities per single work cycle, and the difference in work times between the standard calculation method, snap-back timing PSION and the two cumulative timing methods was much smaller than that in the clear-cutting operations. The duration of work cycles in a thinning operation, determined for the arbitrarily established work cycles, was underestimated by 6% when using the snap-back timing relative to the cumulative video timing, while in the clear-cutting operation, the difference was approximately 12% (Fig. 6). In clear-cut stands, due to greater dimensions of trees, it was sometimes necessary to repeat a particular operation more than once within a work cycle, e.g. operations of delimbing and bucking were performed several times while processing a single tree stem.

Fig. 6
figure 6

Percentage value of the measurement error and the mean duration of a work cycle in the investigated calculation methods, in relation to the cumulative timing VIDEO method

Discussion

The tasks that are currently set up as the objective of a work study do not differ substantially from those formulated by F.W. Taylor over 100 years ago: “A piece-rate system being a step toward partial solution of the labour problem” (Koŝir et al. 2015). The weight of research has shifted slightly towards the optimisation of production systems, and traditional (manual) measurement methods are partly replaced by automated bases. The StanForD control and measurement standard (Dvořák et al. 2011), applied in harvesters, enables the acquisition of a huge database. The problems of using such measurements consist in the lack of verification of certain categories of time and in treating a work cycle as a whole (Purfürst and Erler 2011). For this reason, microcomputers are still used in manual measurements with the manual feeding of time points. The effect of the “human factor” is marked very clearly in the form of errors due to the lack of skill of time recorders and their fatigue, especially in long-term measurements (Nurminen et al. 2006). In the present study, thanks to determination of the reference level (video material), an additional factor was identified which consists of recording short-term activities with difficult-to-establish border points.

The primary purpose of determining the duration of work is to determine the time- and cost-effectiveness of the applied technologies; hence, a time study is usually performed as a continuous study with continuous observation according to the current time (Mederski 2013). This research method is used not only in performance tests but also in analyses of machine operator techniques (Ovaskainen et al. 2004). According to the IUFRO classification (1995), the most useful methods are cumulative timing (Szewczyk 2011b; Nurminen et al. 2006; Dvořák and Walczyk 2013), which yields a cumulative time of observed operations, and a check study, which is a preliminary work variability test aimed to determine the size of a trial sample. Time studies are often the starting point for determining the structure of working time. In the latter case, the appropriate method of measurement would be snap-back timing, which involves separate measurements of elements of work (Bergstrand 1987; Jourgholami et al. 2013; Yoshida and Sakai 2015).

The method of working time measurement with regard to timber harvesting was the object of research in terms of technique of execution (Miyata et al. 1981; Samset 1990) and accuracy in the context of work performance by persons with different levels of training and fatigue (Nuutinen et al. 2007; Spinelli et al. 2013). The necessity to standardise the research methods used in analyses of work with regard to the formulation of work/research objectives, designing experiments, applying appropriate statistical models, adopting appropriate measurement models and elaborating the results has been underlined several times in recent years (Magagnotti et al. 2013). It seems that in the chronometric studies, two more measurement factors require being specified as they have a fundamental impact on the results: the time-measuring technique and the adoption of the proper structure, or “division” of the duration of a given technological operation.

When designing experiments concerning working time, usually two levels of accuracy (seconds per observed operation) are determined arbitrarily: measurement accuracy and the minimum duration of a single operation (Szewczyk 2011a). Samset (1990) and Kanawaty (1992) pointed to the smaller accuracy of measurement of work cycles consisting of categories with significantly different variability and percentage. Hence, for example, in measurements of a chain saw operator’s work, operations with a duration of less than 0.1 min are usually not distinguished while delimbing and bucking operations are usually combined (Sowa et al. 2009; Szewczyk 2009). In analyses of the operation of multi-purpose machines, due to the high variability of operations, the accuracy of measurements is much higher. The time measurement applied in the present study, performed with the accuracy of 1 s, corresponds to the generally applied standards, especially when the work time databases are being constructed during analyses of the video material. Although Pukkila (1969) performed measurements with the accuracy of 2 s, his chronometric measurements concerned less variable work stations in forestry. In their research on machine performance in the CTL harvesting system, Nurminen et al. (2006) determined the duration of individual operations with the use of the counter in a camcorder, reaching a very high accuracy of 1/24 s. The minimum duration of a single operation adopted in further analyses in the present study should take into account its observed variability and the total length of the work cycle. The accuracy level of 1 s, adopted in the present study, is higher than in previous research by Szewczyk (2011a), but it corresponds better to the accuracy of Timer Pro Professional software used for video footage analyses (up to 1/1000 s).

The accuracy of timing measurements is usually linked to the degree of work variability. Seemingly, the problem only comes down to determining the length of a work cycle and dividing it into components. The degree of accuracy of the work cycle division adopted in our study was consistent with the standard classifications seen in other studies (Picchio et al. 2012). The structure of the duration of individual operations observed in work cycles was similar to those reported in other studies, and the differences were due to different stand conditions (Nurminen et al. 2006). The stands analysed in our study were characterised by larger tree diameter, and therefore, the duration of wood-processing operations was higher (42% in thinning stands, 52% in clear-cut stands). A similar situation occurred in the case of travel time between successive work stations. The most likely factor was the impact of the lack of access to the stands via the skid trails.

Time studies consist in measuring repetitive work cycles; therefore, determining their structure is a key issue when planning measurements. Magagnotti and Spinelli (2012) only specify that the structure of a work cycle should accurately describe the work process. The degree of detail of the work cycle division should reflect the degree of complexity of the work. In this respect, the present study is a development of research on work variability and the appropriate selection of measuring tools (Szewczyk 2011a, 2011b, 2014a, 2014b), thus contributing a new element to the issue of work analysis. The present analyses have determined a new factor shaping the accuracy of chronometric measurements, namely the real structure and length of a work cycle that is observable in the field. It is these factors that should, by definition, be taken into account in the design of measurements. According to the current general assumptions, the structure of harvester work cycles is considered to be stable, which is a great simplification. Due to the variability of harvesting conditions, the rhythm of work in different areas may vary, and this should be reflected by the method of taking measurements. In practice, it is difficult to apply detailed methodological procedures on single felling sites (the time series method presented in our study) so as to describe the variability and determine the correct duration of work cycles. In view of the above, simplified indices of the measurement error level could be used, as proposed in our study for operations characterised by lower (thinning operations) and higher (clear-cut operations) work variability.

Conclusions

The accuracy of work time measurements employing chronometric methods is of particular importance for investigation of highly variable technological operations, with short-lasting activities, which is typical of harvester operation. Microcomputers, employed in such studies for more than a decade, may produce errors resulting from the inertia of measurements, due to the manual input of terminal points of the operations under analysis and to misjudging the number of operations constituting a work cycle.

While conducting regular time studies, the existence of work cycles with a stabilised succession of work times is assumed. Particularly, with regard to work sites characterised by a great variability of work, the factual structure of work cycles should be determined, which would be easier if the method of work time series, discussed in this paper, was employed. The primary results indicated that the snap-back timing method is slightly more accurate than the cumulative timing method, in reference to both stable work cycles and more variable work time structure.

For time studies covering harvester operations where the duration of particular activities is measured manually, the snap-back timing method should be recommended, since it is based on measuring the time of every operation separately, determining a mean value of their duration and totalling the data obtained according to the arbitrary, theoretical structure of work cycles.