Figure 2.

Error rates for a random subsample of 1000 clusters. (Colored figure) The error rate for each cycle. The error rate of the Solexa calls has a large increase after cycle 26, while the error rates of the BM-BC, B-I, and Rolexa calls increase gradually over the cycles.

Ji et al. BMC Bioinformatics 2012 13(Suppl 13):S6   doi:10.1186/1471-2105-13-S13-S6