Figure 2.

A general flow chart of the BIP Index development cycle and statistical approach. Dashed line represents a future flow to be repeated periodically. MRA: step-wise multiple regression analysis.

AriƱo et al. BMC Bioinformatics 2011 12(Suppl 15):S4   doi:10.1186/1471-2105-12-S15-S4